Olongapo Subic Volunteers

Thursday, August 25, 2005

Dredging of Sta Rita River started today

Image Hosted by ImageShack.us
Dredging projects to rehabilitate the city's river system started today at Sta Rita River.

Image Hosted by ImageShack.us
Dredging for another part of the city's river system will start anytime next week at Kalaklan River. This project awarded to R.M. VITUG Cosntruction cost P20,000.000 w/ total volume of material to be dredged estimated at 125,775 Cu.M.

Image Hosted by ImageShack.us
The project was awarded to R.D. SADSAD Construction from Angeles City. 63,000 Cu.M. of sand and silt is expected to be excavated in this project which cost P10,000,000.

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us
The desilted materials are brought to the city's landfill in accordance with the City Ordinance authored by Councilor Edwin Piano. This will ensure ample supply of topsoil neccessary to maintain the sanitary landfill.

Image Hosted by ImageShack.us


Photos Below were taken to document the "before and after" impression of the project

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us

Image Hosted by ImageShack.us
Kalaklan River

Image Hosted by ImageShack.us
Looking at Brgy West Bajac Bajc on the right and Mabayuan on the left.

Image Hosted by ImageShack.us
On going drainage project at 22nd St, West Bajac Bajac

Image Hosted by ImageShack.us
River system looking at Leyva St, Brgy Mabayuan; from Escano Residence, Davidson St, WBB

Image Hosted by ImageShack.us
Resident at Davidson St, West Bajac Bajc pointing at the dept of floodwater during last weeks onslaught of water.

0 Comments:

Post a Comment

<< Home